Limiting Conditions
RatingANSI 300
PMA50 bar
TMA400°C
Max Differential Pressure (Barg)22

CDB ENGINEERING SPA
 

Tel. +39 0377 912268/5

Fax +39 0377 910668

Email info@cdbengineering.com

Sizes
1/2" - 3/4" - 1" - 1.1/2" - 2"
Connections
ScrewedASME B1.20.1 (NPT) BS21 (BSP)
Socket weldASME B16.11
FlangedASME B16.5 - UNI - DIN

Main Features:

Excellent air venting

Can be installed in any position

Maximum thermal efficiency under varying conditions

Simple and reliable construction

Ordering Information:

Inlet pressure

Back pressure

Operating temperature

Condensate load

End connections

Thermostatic steam traps LBK22
PosDescriptionMaterialsSpares
1BodyASTM A216WCB 
2CoverASTM A216WCB 
3GasketSW 316/GraphiteX
4Valve AssemblySSX
5ScreenSS 316LX
6GasketGraphiteX
7PlugASTM A105 
8FlangesASTM A105 
Thermostatic steam traps LBK22
Size (inches)LH1H2RF (150#)RF (300#)RF (600#)L-BWWeight (Kg)
L1KgL1KgL1Kg
1/2"95100221752,51853,51853,51951,5
3/4"951002218031904,51904,51951,5
1"95100221803,5200520051951,5
1.1/2"1201404020052108215822012
2"2101404020072158,52201131015
Dimensions: L, H1, H2, are in millimeters (mm)

11/02

Installation:

Prior to installation, clean the lines by blowing through at full steam pressure to remove dirt.

For steam trapping applications the trap should be fitted below the equipment to be drained and as close to the drain point as possible.

Always open isolation valve slowly until normal operating conditions are achieved to avoid system shocks.

Maintenance:

The trap can be maintained without disturbing the piping connections. Ensure that trap is isolated upstream and downstream before attempting to dismantle it. Allow the trap to cool before dismantling.

Item 3 4-5-6 (valve assembly and screen) can be replaced bring the traps as new conditions

COMPANY

PRODUCTS

INFO

Linkedin Youtube chanel

All right reserved. Copyright 2017 by CDB ENGINEERING SPA

Address: L. Maggi, 19 - 26841 Casalpusterlengo (LO) Italy

Paid up share Capital Euro 1.050.000,00 i.v.

VAT NO. 02977730965 - N. REA 1449742

Trademarks are register by their owner